Our first day started with a welcoming ceremony with local dignitaries and the bhairabi students and staff. Once the formalities were over, we were keen to get on with the job(s) in hand; putting up a perimeter fence, building walls and tiered seating for the kids to sit on.
To do this, we also needed to shift 3 huge piles of bricks and 2 massive piles of sand down in the valley. A week's worth of work just in itself!
The boys and staff worked tirelessly all day, not finishing til dusk, long after the local kids had left for home.
After Showers from the local water pipe and a lovely meal prepared with local ingredients, we were all tucked up in bed by 9 and ready for another big day ahead.
Dan Fee


Well done Saints. Looks like everything is progressing to plan.
ReplyDeleteWish i could be there to share your experience, and what about that vista.
Safe travels Craig